Costs & budget
What a Builder Allowance Covers, and Why It's Low
What a builder allowance covers in a new-construction contract, why the number is often set low, and how to plan so you aren't surprised.
· 5 min read
New home build checklists
Printable checklists for homeowners building a new home with a builder. Know what to decide, ask and check, from budget and contract through the pre-drywall walkthrough to the blue-tape punch list, so you catch problems while they're still cheap to fix.
Why Site Ready
Most building mistakes aren't hard to catch. They get missed because nobody checked at the right moment. These checklists are built around those moments.
Know what to ask, what to decide and what to photograph before the insulation goes in and the drywall goes up.
Lock in blocking, Cat6, selections and allowances early, when changes still cost almost nothing.
Show up to every meeting and walkthrough with your questions, so you can talk to your builder in specifics.
Acting as your own GC? Get the subs sheet, bid comparison, high-level schedule, draws and lien waivers, and paperwork tracker too.
Pick your checklist
Each tier includes everything in the one before it. Pay once and keep it.
How it works
Essentials, Complete, or Owner-Builder. Secure checkout takes about a minute.
Your download link appears right after payment and arrives by email too.
Print it or fill it in on a tablet, then check off, initial and photograph each phase as you go.
Watch
Download the Pre-Drywall Walkthrough, the Blue-Tape Walkthrough and a printable punch-out list, taken from the full checklists.
Get a cost range for your size, region, finish level and foundation, broken down by build phase.

Look inside
No filler and no trade lessons. Each item tells you what to decide, ask or check, in the order a build happens. Print it or fill it in on a tablet.
From the blog
Straight answers on costs, selections, walkthroughs and builder contracts. See all guides
Costs & budget
What a builder allowance covers in a new-construction contract, why the number is often set low, and how to plan so you aren't surprised.
· 5 min read
Costs & budget
The questions that matter before you sign a new-construction contract: allowances, what's included, change orders, deadlines and the punch-out list.
· 3 min read
Rough-in & systems
Walk the rough-in with your electrician before the walls close. What to add, what to ask, and why blocking and Cat6 matter.
· 3 min read
FAQ
A printable PDF checklist (Letter size, also fine on a tablet), written for the homeowner and organized in the order a build happens. Every item has a box to check and a space for initials and the date, and each section ends with a sign-off line. Complete and Owner-Builder add fill-in worksheets and logs. The download link arrives as soon as checkout is complete.
If a builder is building your home, Complete is the one most people need. Essentials is the short version with the must-not-miss items. If you're hiring the subs yourself or acting as your own general contractor, get Owner-Builder / Self-GC, which adds the homeowner-side work of running the build.
No. Find your current stage and work forward. The pre-drywall walkthrough and the blue-tape walkthrough save the most money, and each has its own section.
These checklists are written for homeowners: what you decide, do, ask and check. They don't teach trades or code. Builders are welcome to use them to prepare for client meetings and walkthroughs.
No. Your builder, their crews and your local inspectors handle code, inspections and trade quality, and your building department, approved plans and local code always come first. These checklists focus on what you decide, do, ask and check as the homeowner, and they don't replace licensed professionals.
Email hello@sitereadyhome.com within 30 days for a full refund.