Selections are the long list of choices you make on a new build: cabinets, counters, floors, tile, paint, fixtures, lights. Most delays and surprise bills come from here.

The rule is simple. Make selections early. Missed deadlines slow the build and always cost something. Your contract spells out the details, so read it.

Before you pick anything

  • Get the allowance list in writing. Allowances are often set low. Know what each one covers.
  • Ask what's included and what's an upgrade.
  • Ask whether you can supply your own items, and whether the builder adds a markup when you do.
  • Get all answers by email.

Then work in this order. Earlier items drive later ones.

1. Plan-level choices

Do these first. They affect framing and rough-in.

  • Fireplace model. Different fireplaces need different rough framing. Pick the model early.
  • Tub and plumbing fixtures. Tub placement depends on the fixture. Decide plumbing fixtures early, especially the tub.
  • Shower niches. Have them framed at rough-in. Decide both height and width.
  • Garage door opener wall button. Pick the location for the wall button only.
  • Appliance sizes. Cabinets are built around them. Know your model numbers and dimensions.

2. Cabinets

Cabinets are the biggest selection challenge. There are many styles, finishes and options, and the layout depends on your appliances.

  • Give the cabinet designer your appliance sizes.
  • Don't assume cabinets will go to the ceiling. They probably won't.
  • Decide where you want drawers and where you want doors.
  • Confirm trim, pulls and hardware are in the plan.

3. Countertops

  • Have the cooktop and every sink on site for templating.
  • Decide on edge profile and backsplash. A full-height slab backsplash is a popular upgrade, so price it.
  • You don't need to see the slab to choose, but you do need the sinks and cooktop on site before the template visit.

4. Flooring

Keep it simple. Pick the material and pick a running direction. Don't leave direction for the installer to decide.

5. Tile

  • Decide the tile, grout color and layout for each wet area.
  • Put the niche positions and the tile choice together. They affect each other.

6. Lighting and electrical

  • Choose fixtures early enough that the electrician knows the box locations.
  • Plan switch locations and dimmers.
  • If you want smart switches, ask about neutral wires at the box.
  • If you like color-changing lights, use RGB bulbs in standard cans or fixtures.
  • Ask for the electrician walkthrough at rough-in. See what to add at rough-in.

7. Paint

Don't say "something light and warm." Give exact paint codes.

  • Brand, color name or code, and sheen.
  • Where each color goes, room by room and surface by surface.
  • Keep sheens simple. Walls: flat or eggshell. Ceilings: flat white ceiling paint. Interior trim and doors: satin or semi-gloss.
  • Send it all by email.

Exterior is easier. Standard is one siding color and one trim color. Then choose whether soffit and fascia match the siding or the trim.

8. Windows and doors

  • Code-required windows are good today. You don't need to spend more.
  • Black windows cost about twice as much. Decide if the look is worth it.
  • Buy door hardware that is keyed alike, so one key works every door.

9. Everything else

  • Plumbing fixture finishes that match across the house.
  • Cabinet pulls and bath accessories.
  • Mailbox, house numbers and exterior light fixtures.

Common selection mistakes

  • Choosing finishes before you know the appliance sizes.
  • Waiting on the tub or fireplace, then paying to reframe.
  • Picking by photos only, then not liking it in the room.
  • Going over the allowance on cabinets and having nothing left for flooring.
  • Telling the builder a color by name instead of a paint code.
  • Changing your mind after the order is placed.

What to bring to a selections appointment

  • Your plans and room list.
  • Appliance model numbers and sizes.
  • Your allowance list and budget.
  • A phone for photos of every sample and its code.
  • A notes app or a printed tracker.

Photograph each sample with its code, and email yourself the list when you leave.

Keep a record

Write each selection down with the product, code and location. A tracker or spreadsheet is fine. Email the builder the final list and ask for a reply that confirms it.

Tip: Late changes cost more than early ones. The same goes for upgrades you add after rough-in.

The full Complete checklist includes a selections tracker and a paint schedule. Start with the free sample if you want to see the format.

This is general information, not professional advice. Follow your contract and local requirements.